The first delivery of structural steel plates needed to repair the Sherman Minton Bridge arrived at 6:30 p.m. Monday. No abnormal weather or other unanticipated issues have thus far impacted the repair schedule that would reopen the bridge to traffic in March. The Interstate 64 bridge over the Ohio River between New Albany and Louisville was closed Sept. 9 after a significant crack was discovered in a load-carrying element of the bridge.